BOM (Bill of Materials) vs Box Build: Where Hardware Projects Break
Most hardware teams sweat over BOM, which makes sense, as the Bill of Materials is the blueprint that lists every […]
Your blog category
Most hardware teams sweat over BOM, which makes sense, as the Bill of Materials is the blueprint that lists every […]
We get it: You have been handling everything in-house, whether it is assembling printed circuit boards (PCBs) or putting together
If you’re building a product for the Indian market that falls under the Compulsory Registration Scheme (CRS) or requires an
90% of product delays can be traced back to poor manufacturing decisions, and pcb assembly for startups is often where
PCB assembly can account for 30–50% of your total product build cost, and in high-mix or low-volume projects, that percentage
Up to 50% of product launch delays in electronics manufacturing happen after the PCB is assembled. Not because the board
Scaling up battery pack production is not a manufacturing challenge. It’s a challenge of balancing act between speed and precision,